rfay
Since Last Standup:
* Pestered on git.drupalcode.org extremely slow and nnewton has a ticket opened with OSL for a solution.
By the demo:
* continue pestering
* help at rehearsal and demo
Blockers:
* none
chizu
Since Last Standup:
* Testing the Twisted SSH work
* Finished code right after last meeting, Howard has merged it
By the demo:
* Demo preparation
Blockers:
* None
mikey_p
Since last standup
* began looking though cvslog module
By the demo:
* cvs.module (preliminary)
* version control issues (preliminary)
* updated version of d.o testing profile
Blockers
* None
sarah_p
Since last standup:
* She joined us.
By the demo:
* will have themed the views for the demo
Blocked:
* Completely blocked by howard (according to Howard) but soon to be resolved.
sam:
Since last standup
* working entirely on crud; taking longer than anticipated - reasonably close.
By the demo:
* one big thing left for CRUD that he's working on
* delaying response on issues to focus on CRUD
* Switch to demo preparation mode
Blockers:
* None
tizzo:
Since last standup:
* fixed a bug in vies_field_view
* gotten all the stuff set up for commit log
* started working on better error responses from Twisted SSH
* merged chizu's work
* getting them ready to run as deamons (for next sprint)
By the Demo:
* a touch of work all done by the demo except the better error responses.
* help with rehearsal
Blocked:
* only by day job
neclimdul:
By the Demo:
* talk with Sam @ 2:30 pacific about issues blocking him.
Blocked:
* by day job and questions for sam (but the day job has kept the questions from really being blockers).
marvil07:
Since the last standup:
* opened http://drupal.org/node/973890
* opened http://drupal.org/node/973944
* opened http://drupal.org/node/973782
* worked on log parser (not complete)
By the Demo:
* log parser done
* may try to work on tests as well.
Blocked:
* Blocked by completion of CRUD.
eliza411:
Since the last standup:
* working on resources for the next two sprints
* working on overall timeline
By the Demo:
* User stories for Project module
* demo rehearsal
Blocked:
* Still don't have an assessment of time for Project Version Control / Project Node integration and Project Module (mikey_p is taking this up).