LSD CSI Prototype
The initial Prototype for CSI is live. The demo includes integration between SPS, ERS and collections.
The install is based upon http://drupal.org/project/sps_prototype. Please log any issues at http://drupal.org/project/issues/1701722.
http://prototype.csi.dev3.fayze2.com/
user: demo
pw: lsd-csi
LSD CSI Sprint 3 Risks
Risks for Sprint 3 - Risks and Plans
Risk 1: Integration points for Workbench, SPS, ERS and Reactions not identified in Sprint 3 planning could setback completion of working prototype.
Plan: A goal of our in-person sprint on 7/26 is to discuss all integration points to ensure all have been planned for and tasked appropriately for Sprint 3. We will review all the module integration points for workflow (jec006 and fmitchell), front end integrations (jec006), some refactoring of the framework specifically reactions (e2thex) and cleaning up collections (indytechcook).
Read moreLSD CSI Prototype
The prototype for CSI will be hosted here: http://drupal.org/sandbox/indytechcook/1701722
Read moreLSD CSI Sprint 2 Recap
Sprint 2 wrapped up (7/24), or roughly 1d (8h) behind schedule. Great progress was made during Sprint 2 and the velocity of the project picked up greatly from Sprint 1 http://groups.drupal.org/node/242358.
Sprint 2 deliverables and milestones included building the plugins and modules per http://groups.drupal.org/node/233058 and http://groups.drupal.org/node/233098.
This high-level goal translated into the following tasks http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+3
Read moreSite Preview Module
The Site Preview System Framework has been promoted to a full project on Drupal.org http://drupal.org/project/sps
Development will continue here.
Read moreCollections
I'm proud to announce that the collection module has been posted as a contributed project on Drupal.org. http://drupal.org/project/collections
Read moreLSD CSI Weekly Update for 7/23
Here is the weekly development update.
Last week
- Continued work on Sprint 2.
- Presentations for LSD members
On Board Brade Blake for developmentBrade will not be joing the project- Prep for Sprint 3
This week
- Begin Sprint 3.
- Create initial Prototype
- On site meeting in DC
- Sprint 2 Review document and Sprint 3 goal documents
LSD CSI Weekly Update for 7/16
Here is the weekly development update.
Last week
- Sprint 1 Recap
- Begin Sprint 2
- Continued work on documentation Code
- On Board Kellye Rogers as a new PM for Phase2
- Begin presentation Prep
This week
- Continued work on Sprint 2.
- Presentations for LSD members
- On Board Brade Blake for development
- Prep for Sprint 3
LSD CSI Sprint 1 Recap
Sprint 1 ended on 7/6. The following deliverables were part of Sprint 1 per http://groups.drupal.org/node/233058 and http://groups.drupal.org/node/233098.
- "Build Framework"
This was a very high level and abstract goal. The actually tasks turned out as http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+1.
During this Sprint we also worked out a more detailed view of the different parts of the system. http://groups.drupal.org/node/241743. This page also includes the different parts of the system that will be plugable
Plugable Parts
- Widgets
- Conditions
- Overrides
- Reactions
The controllers and manager of the system will have the ability to be completely swapped out by changing configuration. This will allow for complete control of the system without having to hack the module.
The sprint lasted 3 weeks rather then 2. This was due to the complexity of the framework design and the initial ramping up of resources. The primary measurement of the success of the sprint is in the quality of the code and the high test coverage.
The code can be access by cloning the git repository: http://drupal.org/node/1621176/git-instructions/7.x-1.
Test can by run by putting the module into your Drupal installation, enabling the "sps" and "testing" modules the running the tests for the sps module from either admin/config/development/testing or via the command line "php scripts/run-tests.sh --color --verbose SPS,SPSInteractive" from the Drupal root.
Sprint 2 will entail creating the plugins for the Framework along with the integration points with Drupal and other modules. Sprint 2 tickets are listed here: http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+2.
Read moreCSI Weekly Update for 7.2
Here is the weekly development update.
Last Week
document detailed dev/testing process: See Development Process and Testing Process- Document Class design for Setters/Conditions/SiteState changes (http://drupal.org/node/1623104)
- SiteState Complete
- Continued work on Overrides/Forms
- The Site Manager was completed. Issue will be updated. http://drupal.org/node/1623128
This Week
<
ul>
Read more